1 documents found
Information × Registration Number 0107U006261, R & D request Title Examination of technical level of the main equipment installed at the hig-strength tubes of tube rolling chop No. 1 and new finishing lines of tube rolling shop No.4 and definition of throughput of the tube finishing lints for the planned. Head Пікінер Юрій Спірідонович, Registration Date 06-08-2007 Organization popup.description1 popup.nrat_date 2024-12-10 Close
search.res_rk
Head: Пікінер Юрій Спірідонович. Examination of technical level of the main equipment installed at the hig-strength tubes of tube rolling chop No. 1 and new finishing lines of tube rolling shop No.4 and definition of throughput of the tube finishing lints for the planned.. . № 0107U006261
1 documents found

Updated: 2026-03-21