1 documents found
search.res_rk
Head: Chukanova Nataliya P.. Scientific and technical support for the work on the stabilization of soil bases under the ventilation chamber No. 237 of the Kiev Metro, located at the junction of Art. Slavutich "Vydubychi" and the sealing of its joints to the metro tunnel and to restore the waterproofness of the structures of the site in the places of damage to the waterproofing that arose as a result of drilling under the installation of engineering devices..
State enterprise" Research Institure of Building Productson". № 0117U003901
1 documents found
Updated: 2026-03-26
