1 documents found
Information × Registration Number 0119U101688, ( 0220U102412  ) R & D request Title Development of addition to the "Draft degasification", "Draft degasification 2 of the southern lava of the Bremsberg No 3 horizon 550m of the reservoir l8 "with measures to manage the degasification system of the mine during fires, elaboration of the addendum to the "Draft degasification "taking into account the prospects for the development of mining operations until 2015", "Draft degasification 8 northern lava slope number 1 horizon 550m layer l8" with measures to manage the degassing system of the mine during the fires, agreed "Project of the isolated drainage of methane air mixture 2 of the southern lava of the bremsburger № 3 horizon 550m of the reservoir l8" approval of "The project of the isolated drainage of the methanoair mixture 8 of the southern lava of the bresberg № 3 horizon 550m of the reservoir l8", the conclusion on the approval of the materials for assessing the feasibility of the application of preliminary wetting of coal in the array 2 of the southern lava of the Br Head Minieiev Serhii P., Доктор технічних наук Registration Date 03-05-2019 Organization Institute of Geotechnical Mechanics named by N. Poljakov of National Academy of Sciences of Ukraine popup.description1 Addition to the project of degassing with measures for managing the degasification system of the mine during the fires, approval of the project of the isolated drainage of the methane-air mixture popup.nrat_date 2024-12-10 Close
search.res_rk
Head: Minieiev Serhii P.. Development of addition to the "Draft degasification", "Draft degasification 2 of the southern lava of the Bremsberg No 3 horizon 550m of the reservoir l8 "with measures to manage the degasification system of the mine during fires, elaboration of the addendum to the "Draft degasification "taking into account the prospects for the development of mining operations until 2015", "Draft degasification 8 northern lava slope number 1 horizon 550m layer l8" with measures to manage the degassing system of the mine during the fires, agreed "Project of the isolated drainage of methane air mixture 2 of the southern lava of the bremsburger № 3 horizon 550m of the reservoir l8" approval of "The project of the isolated drainage of the methanoair mixture 8 of the southern lava of the bresberg № 3 horizon 550m of the reservoir l8", the conclusion on the approval of the materials for assessing the feasibility of the application of preliminary wetting of coal in the array 2 of the southern lava of the Br. Institute of Geotechnical Mechanics named by N. Poljakov of National Academy of Sciences of Ukraine. № 0119U101688
1 documents found

Updated: 2026-02-14