1 documents found
search.res_rk
Head: Chepurnyi Volodymyr I.. Non-destructive testing, technical diagnostics, instrumental examination, comprehensive evaluation of the technical condition and operational safety of mining facilities of PJSC ArcelorMittal Kryvyi Rih (elevator 1045-1135 m). Non-destructive testing, technical diagnostics, instrumental survey, comprehensive assessment of the technical condition and operational safety of geotechnical systems "Vertical mine shaft - connection with ore yards - rock massif" of mining facilities (Kirov-Klityov, "Skhidna" mines, No. 1 named after Artem ) SHU for underground ore mining (on the right of mine) PJSC "ArcelorMittal Kryvyi Rih"..
Kryvyi Rih National University. № 0123U103384
1 documents found
Updated: 2026-03-27
