1 documents found
search.res_rk
Head: Marchuk Serhii A.. Selective studies of the volumes and design parameters of the arrangement of building structures at the construction site: "Construction of the section of the Syretsko-Pecherska subway line from the Syrets station to the Vynogradar residential area from the electric depot in the Podilsky district (the section from the Syrets station to the Prospekt Pravdy station with two stations ("Mostytska" and "Prospekt Pravda") and a section of the fork branch towards the station "Vynogradar" (I stage of construction)..
State enterprise" Research Institure of Building Productson". № 0123U104203
1 documents found
Updated: 2026-03-26
