1 documents found
Information × Registration Number 0206U000227, 0105U001145 , R & D reports Title To develop the estimation technique of work size and work pattern on bridge maintenance. popup.stage_title Head Fal Andrey E., Registration Date 18-01-2006 Organization State Highway Scientific Research Institute popup.description2 The object of the research is the bridge structures on the motor roads. The aim of the work is the development of the assessment procedure of the work amount and the work structure on bridge current maintenance. The scope - highway bridge maintenance. The method of the study is theoretically practical. The search, analysis of the literary sources and normative documentation in the area of investigation and the bridge and pipe testing and the experience of actually examined and tested structures formed the basis for the creation of the assessment procedure for the work amount and work structure on current maintenance. In the result, the method, which will allow to assess the work amount and work structure on current bridge maintenance is developed according to the results of their examination and technical diagnostics. The implementation of the results will give the possibility to carefully estimate the expenditures for current maintenance and to cut costs for repair and reconstruction of bridges to 15%after the examination of the structures of the existing bridges.5635 Product Description popup.authors popup.nrat_date 2020-04-02 Close
R & D report
Head: Fal Andrey E.. To develop the estimation technique of work size and work pattern on bridge maintenance.. (popup.stage: ). State Highway Scientific Research Institute. № 0206U000227
1 documents found

Updated: 2026-03-28