1 documents found
Information × Registration Number 0208U002304, 0107U009899 , R & D reports Title Development of requirements to the feasibility study on works on operation term prolongation of nuclear power plants energy units popup.stage_title Head Shulygin Boris, Registration Date 25-01-2008 Organization State scientific engineering center of control systems and emergency response popup.description2 The document “Methodical Recommendations. Requirements to Technical and Economical Substantiation of the Works on Prolongation of Terms of Operation of the Ukrainian NPP” is elaborated. The Methodical recommendations cover the substantiation issues of prolongation operation over the designed 30-years term for all existed units of Zaporiggya (6 units), Rivne (4 units), Chmelnitsky (2 units) and South-Ukrainian (3 units) NPPs, which further operation is planned by “The Energy Strategy of Ukraine for the period up to 2030” approved by the Order of The CM of Ukraine No 145-p at 15.03.20065635 Product Description popup.authors popup.nrat_date 2020-04-02 Close
R & D report
Head: Shulygin Boris. Development of requirements to the feasibility study on works on operation term prolongation of nuclear power plants energy units. (popup.stage: ). State scientific engineering center of control systems and emergency response. № 0208U002304
1 documents found

Updated: 2026-03-27