1 documents found
R & D report
Head: Babichev Leonid. Experimental researches conducting, development of compatible decisions, optimum methods, requirement specifications for the rehabilitation of 200 MW and 300 MW capacity coal power units in the effective regulation conditions of the frequency and capacity in Ukraine UPS (the united power system). (popup.stage: ). Kharkiv Central Design Bureau "Energoprogress" , Branch of Kotloturboprom Limited. № 0208U006204
1 documents found
Updated: 2026-03-23
