1 documents found
Information × Registration Number 0210U007729, 0110U007641 , R & D reports Title Feasibility Study on Construction of Gas Recovery Turbine Power Plant popup.stage_title Head Polyakov Nikolaj Ivanovitsh, Registration Date 07-12-2010 Organization State-Owned Ukrainian institut for designing iron and steel works popup.description2 Design object is gas recovery turbine power plant. Two top gas recovery turbines of 16 MW total capacity will make the basis of power plant. The Project is aimed at reduction of fuel consumption in BF process due to BF gas recovery. Construction of power plant will enable fuel-free production of 120 mil kW.h/year electric power to cover the enterprise requirements. Total power-saving effect - 53.57 thou t reference fuel per year. Product Description popup.authors Вишневський Богдан Миколайович Вовк В'ячеслав Михайлович popup.nrat_date 2020-04-02 Close
R & D report
Head: Polyakov Nikolaj Ivanovitsh. Feasibility Study on Construction of Gas Recovery Turbine Power Plant. (popup.stage: ). State-Owned Ukrainian institut for designing iron and steel works. № 0210U007729
1 documents found

Updated: 2026-03-24