1 documents found
R & D report
Head: Molchanov Volodymyr. "Consolidated figures the cost of construction of substations with voltage of 6 kV to 150 kV power transmission lines and voltage from 0.38 kV to 150 kV. Norms," "Terms of design and construction of substations with voltage of 6 kV to 150 kV power transmission lines and voltage from 0.38 kV to 150 kV. Norms.. (popup.stage: ). Ukrsilenergoproekt Ukrainian research, design, investigation and engineering institute. № 0210U007790
1 documents found
Updated: 2026-03-24
