1 documents found
Information × Registration Number 0211U005610, 0108U009854 , R & D reports Title Engineering of higt pressure pipeline armature range of common industrial purpuse popup.stage_title Head Lifanovsky George, Registration Date 09-09-2011 Organization "Research and production enterprise "Central design-engineering institute of armature industry". Ltd popup.description2 An object of development is a pipeline armature high-pressure общепромышленного application (further wares of pipeline armature). An aim of work is creation of series of pre-production models of pipeline armature high-pressure общепромышленного application, as substitutes of the imported analogues, for setting of them on the pipelines of steam and water of the technological systems of the thermal electric stations with the purpose of ceiling of working environment (pair or waters); conditioning for the successful competition of home wares of pipeline armature with foreign on the markets of Ukraine and CIS and organization of new workplaces on an enterprise. In the process of execution experienced-designer work was carried out by volume design of eight types of pipeline armature - 3D models, the estimation of durability of materials of corps is conducted, lids, crances, piattis, turned grey etc.; the drafts of frame-clamping units and details of pipeline armature are worked out, guidances are worked out for exploitations, passports, programs and methodologies of tests, calculations are executed on durability, the projects of technical requirements are worked out. The pre-production models of pipeline armature (8 things) are made, their plant is conducted that preliminary tests. Conforming to of the made pre-production models the requirements of designer documentation. is confirmed. For realization of warranty tests on operating parameters development and making of tent-bed test were conducted. On the Ladiginskaja TES this stand was connected to the pipeline of steam and hot water of the station, works were conducted on the appointed resource (recurrence of "open-closed") of pre-production models of pipeline armature. The results of tests showed reliability of worked out pipeline armature and accordance to the requirements of requirement specification. Tested according to the norms of ДСТУ ГОСТ 5762:2004, ГОСТ 5761-74, ГОСТ 24570-81, to the requirements of the programs of tests and other. Product Description popup.authors Калина Наталія Олександрівна Лукашева Наталія Валентинівна Миргород Лариса Миколаївна popup.nrat_date 2020-04-02 Close
R & D report
Head: Lifanovsky George. Engineering of higt pressure pipeline armature range of common industrial purpuse. (popup.stage: ). "Research and production enterprise "Central design-engineering institute of armature industry". Ltd. № 0211U005610
1 documents found
search.subscribing
search.subscribe_text
Updated: 2026-03-27
