1 documents found
Information × Registration Number 0212U001001, 0110U008566 , R & D reports Title A standard of organization of Ukraine is the "Resource element estimate norms on construction-works "Complex of works from the gasket of reinforce-concrete pipes in tunnels from separate reinforce-concrete blocks with a futerovkoy polyethylene diametrom 2760mm and long 1470 mm" popup.stage_title Head Danchenko Maria Ivanivna, Registration Date 05-01-2012 Organization Centre "Ekobud" popup.description2 The object of work - JMA D.2.2-01387432-002: 2011 "Resource element estimated standards for construction work. Laying concrete pipes in the tunnel secondary frames from blocks lined sewer." Purpose - Development of JMA D.2.2-01387432-002: 2011 "Resource element estimated standards for construction work. Laying concrete pipes in the tunnel secondary frames from blocks of sewer lining" in order to determine the fair value of the works due to lack of in the current regulatory framework rules of the relevant work. Methods of work - research, study, hronometrazhni observation, analysis, comparison, evaluation, development of the estimated standards on construction and development of the estimated standards of construction machinery. The results - D.2.2 SOU-01387432-002: 2011 "Resource element estimated standards for construction work. Laying in the tunnel corresponds to the optimal technology performance. Regulations developed as a standard of Ukraine, which defines the standard cost of resources to perform work, absent in the current regulatory framework in construction. The degree of implementation - JMA D.2.2-13317261-002: 2011 approved in due course. Areas of Application - results will be used in the construction industry. Product Description popup.authors Бараненко Василь Григорович Данченко Марія Іванівна Романенко Віра Дмитрівна popup.nrat_date 2020-04-02 Close
R & D report
Head: Danchenko Maria Ivanivna. A standard of organization of Ukraine is the "Resource element estimate norms on construction-works "Complex of works from the gasket of reinforce-concrete pipes in tunnels from separate reinforce-concrete blocks with a futerovkoy polyethylene diametrom 2760mm and long 1470 mm". (popup.stage: ). Centre "Ekobud". № 0212U001001
1 documents found

Updated: 2026-03-26