1 documents found
R & D report
Head: Bulash Oleksandr Vasyl'ovych. Revision of the RTM 36 Ukraine 10-91 "Instructions for welding for steam and hot water pipelines"; Revision of the RTM 36.23-93 "Welding and assembly works during the manufacture, installation and repair of vessels working under pressure"; Elaboration of a draft of DSTU "Installation of vertical cylindrical steel tanks for oil and oil products storage with capacity from 100 to 50 000 m3". (popup.stage: ). The LTD. "Technical committee special. № 0216U000600
1 documents found
Updated: 2026-03-23
