1 documents found
Information × Registration Number 0217U000236, 0113U004674 , R & D reports Title Development of technical decisions on the re-equipment of typical boiler plants (city cleaning water system) for biogas burning popup.stage_title Head Sigal I., Registration Date 24-01-2017 Organization Institute of Gas of National Academy of Science of Ukraine popup.description2 Technical project for conversion of the boiler room for the simultaneous combustion of biogas and natural gas in a boiler burner device DKVR-20/13 was designed. At the same time gas tank can be completely taken out of service, but it requires the installation of new elements on biogas pipeline Digestion tanks, boiler: biogas drainage system, flame arrester, biogas metering station, etc. Product Description popup.authors Марасін О.В. Сігал І.Я. Сміхула А.В. popup.nrat_date 2020-04-02 Close
R & D report
Head: Sigal I.. Development of technical decisions on the re-equipment of typical boiler plants (city cleaning water system) for biogas burning. (popup.stage: ). Institute of Gas of National Academy of Science of Ukraine. № 0217U000236
1 documents found

Updated: 2026-03-21