Information × Registration Number 0217U006407, 0116U007641 , R & D reports Title To work out the project of degassing of 596 lava of layer of С6, by means of the underground дегазаційної setting, to work out events on the management of degassing of area of coulisse of 596 lava of mine the system "Yubileynaya" PSS of "PershotravenskeMineGroup" Public Joint-stock Company of "DTEK Pavlogradugol" during a fire and to co-ordinate "Project of degassing of 596 lava of layer of С6 of mine "Yubileynaya" PSS of "PershotravenskeMineGroup" Public Joint-stock Company of "DTEK Pavlogradugol ", in 2016 popup.stage_title Head Mineev S.P., Доктор технічних наук Registration Date 23-05-2017 Organization Institute of Geotechnical mechanics of NAS of Ukraine popup.description2 A research object is a sheth of coal mine. The article of researches is degassing of sheth of 596 lava of layer of С6 of mine "Yubileynaya" PSS of "PershotravenskeMineGroup" Public Joint-stock Company of "DTEK Pavlogradugol". Methods of researches are generalization and analysis of results, methods are a mate. statisticians, calculations on standard methodologies. As a result of implementation of work the analysis of basic data is conducted about mining-and-geological and горнотехнических descriptions of sheth of 596 lava of layer of С6 mine "Yubileynaya" PSS of "PershotravenskeMineGroup" Public Joint-stock Company of "DTEK Pavlogradugol". The calculation of the expected selection of methane within the limits of sheth, expense of air is executed for ventilation of sheth, necessary efficiency of degassing, required diameters of gas pipeline, expense of air in making in the place of setting of mixer chamber. Events are worked out on providing of safety of works at the boring drilling and exploitation of decontamination mining holes, during exploitation of underground gas-drainage, at transporting of gas, events on a management by the decontamination system of mine "Yubileynaya" during fires. Project of degassing is worked out on the period of working off 596 lava of layer of С6. The captivation of gas will come true by underground gas-drainage equipped by three vacuum-pumps of ВВН- 50 by the nominal productivity of 50 м3/mines simultaneously from the mining holes bored on the sheths of 126 and 596 lavas of layer of С6. Underground gas-drainage is accommodated in the specially prepared chamber in arrival №2 from an east haulage drift №2 on an east group conveyer drift №2. A chamber gets some fresh air the fresh stream of air. Results of introduction of developments - application of the worked out recommendations allowed to promote gas safety of sheth. It gave an opportunity to provide safety of conduct of stopping on a gor on mine "Yubileynaya", that has a large socio-economic and ecological value. Product Description popup.authors Дякун Р.А. Мінєєв С.П. Нарівський Р.М. Поляков Ю.Є. Прусова А.А. Рудь В.П. Смірнов А.Н. Хворостян Л.В. popup.nrat_date 2020-04-02 Close
R & D report
Head: Mineev S.P.. To work out the project of degassing of 596 lava of layer of С6, by means of the underground дегазаційної setting, to work out events on the management of degassing of area of coulisse of 596 lava of mine the system "Yubileynaya" PSS of "PershotravenskeMineGroup" Public Joint-stock Company of "DTEK Pavlogradugol" during a fire and to co-ordinate "Project of degassing of 596 lava of layer of С6 of mine "Yubileynaya" PSS of "PershotravenskeMineGroup" Public Joint-stock Company of "DTEK Pavlogradugol ", in 2016. (popup.stage: ). Institute of Geotechnical mechanics of NAS of Ukraine. № 0217U006407
1 documents found

Updated: 2026-03-22