1 documents found
Information × Registration Number 0218U000628, 0115U004962 , R & D reports Title HPP Ukrhydroenergo. Reconstruction. II stage. Kremenchug HPP. Working documentation. Seismic microzoning of areas allocation of basic buildings of Kremenchug HPP and generating of designed accelerograms for project and maximum design earthquakes popup.stage_title Head Kendzera Oleksandr, Registration Date 06-02-2018 Organization S.I.Subbotin Institute of geophysics HASU. popup.description2 The normative balance of the Kremenchug hydroelectric power station location is specified with the use of methods of general and detailed seismic zoning. Completed seismic zoning areas accommodate basic facilities Kremenchug HPP by geological analogies by seismic rigidity and method for detecting earthquakes, explosions and high microseism. Seismological models of the environment, to the crystalline basement, sites of the main structures of the Kremenchug hydroelectric power station were built. The calculation of their frequency characteristics is carried out. Built complex calculation accelerograms and response spectra for design simulation (software) and calculated (IGC) earthquake with dynamic calculation of basic facilities Kremenchug HPP. A scientific and technical report on the performed work is prepared.5481 Product Description popup.authors Вербицька Оксана Сергіївна Вербицький Сергій Тарасович Лісовий Юрій Володимирович Сапужак Ігор Ярославович Семенова Юлія Володимирівна popup.nrat_date 2020-04-02 Close
R & D report
Head: Kendzera Oleksandr. HPP Ukrhydroenergo. Reconstruction. II stage. Kremenchug HPP. Working documentation. Seismic microzoning of areas allocation of basic buildings of Kremenchug HPP and generating of designed accelerograms for project and maximum design earthquakes. (popup.stage: ). S.I.Subbotin Institute of geophysics HASU.. № 0218U000628
1 documents found

Updated: 2026-03-22