Head: Verbitskyi Sergiy Tarasovich. Dnistrovska HNPP. In-situ control, special research and monitoring of structures at the completion the first stage construction of the Dnistrovska HNPP in consist of three hydro units. Seismic monitoring. Conduction of regime seismic observations by 1 temporary seismic station for the period until December 2017 to November 2018.. (popup.stage: ). S.I.Subbotin Institute of geophysics HASU.. № 0219U000679