1 documents found
Information × Registration Number 0219U005514, 0117U005246 , R & D reports Title Provide services to develop recommendations for the safe conduct of sliding 82-1146 meters of drift layer "Mazurka-West" ahead of slaughter roadway traversing the line first slaughter lava ledge 50 meters and more popup.stage_title Head Sofiyskij Konstantin Konstantinovich, Доктор технічних наук Registration Date 27-11-2019 Organization The Polyakov Institute of geotechnical mechanics of NAS of Ukraine popup.description2 The object of research is the processes of distribution of rock pressure that occur in the excavation area during its preparation for mining processes. The subject of research is the mining and geological and mining technical parameters, as well as the parameters of the development system that are present when preparing the excavation site for mining processes. The purpose of the work is to provide services in the form of recommendations for the safe conduct of the buggy gangway 82-1146 m across the "Mazurka-Zahid" formation ahead of slaughter of the buggy gangway from the slaughter line of the first lava scarp by 50 m or more. As a result of the implementation of research work have been developed and presented, which include a list of necessary measures aimed at ensuring an uninterrupted and safe technological process of preparing the mining site for coal extraction with jackhammers. The application of these recommendations in industrial conditions will allow the clean-up work at a high safety-technological level, which will provide a positive economic, environmental and social effect. SLAUGHTER LINE, LEADING SLAUGHTER, BUGGY GANGWAY, LAVA SETTING, WIDTH OF REFERENCE PRESSURE ZONE. Product Description popup.authors Агаєв Руслан Агагулаєвич Софійський Костянтин Костянтинович Шейко Анатолій Васильович popup.nrat_date 2020-04-02 Close
R & D report
Head: Sofiyskij Konstantin Konstantinovich. Provide services to develop recommendations for the safe conduct of sliding 82-1146 meters of drift layer "Mazurka-West" ahead of slaughter roadway traversing the line first slaughter lava ledge 50 meters and more. (popup.stage: ). The Polyakov Institute of geotechnical mechanics of NAS of Ukraine. № 0219U005514
1 documents found

Updated: 2026-03-25