Information × Registration Number 0219U101138, 0118U006078 , R & D reports Title To conduct research works for development of recommendations on the safe conduct of mountain works in the conditions of mine "Anniversary" and to work out the project of degassing in the conditions of mine "Stepova" PSS of "PershotravenskeMineGroup" Private Joint-stock Company "DTEK Pavlogradugol", in 2018 popup.stage_title Head Minieiev Serhii P., Доктор технічних наук Registration Date 13-05-2019 Organization Institute of Geotechnical Mechanics named by N. Poljakov of National Academy of Sciences of Ukraine popup.description2  As a result of the performance of the work, technical documentation on the construction of dead-end workings and working out the excavation sites of "Anniversary" and "Stepova" mines has been analyzed. The calculation of the expected methane emission and air flow for ventilation of the excavation sites 172 and 175 of the C6 layer of the "Stepova" mine is performed, as well as the calculation of the parameters and mode of degassing of the roof by boreholes, calculation of the required gas pipeline diameters and the operation mode of the vacuum pump. A project was developed for the degassing of the excavation site 172 of the C6 mine of the "Stepova" mine and the Degassing project for the excavation site 175 of the C6 mine "Stepova". "Recommendations for ensuring gas safety of works on the construction of a dead-end development of the eastern drainage gangway No. 2 of the "Anniversary" mine at the installation of its local ventilation fans in the development with an outflow of air are developed." The arrangement of fans for local ventilation of the dead-end development of the eastern drainage gangway No. 2 in 600 assembled drifts is agreed upon, with the outflow of air flow provided that the recommendations for ensuring gas safety are fulfilled. "Recommendations for ensuring safe working conditions in the conduct of the dead-end workings of the 174 gangway from the horizon of 490 m from the dead end of the western main drift of the horizon 490 m, located in the tunnel, the mine "Stepova"." It was agreed to conduct a deadlock for the construction of a 174 road gangway from a 490 m horizon from the dead end of a west 490 m long horizontal drifting drift in the tunnel, provided that the developed recommendations for ensuring gas safety are fulfilled. The results of the implementation of the developments - the application of the developed recommendations allowed to ensure gas safety in the conduct of mining operations, which is of great socioeconomic and ecological import Product Description popup.authors popup.nrat_date 2020-04-02 Close
R & D report
Head: Minieiev Serhii P.. To conduct research works for development of recommendations on the safe conduct of mountain works in the conditions of mine "Anniversary" and to work out the project of degassing in the conditions of mine "Stepova" PSS of "PershotravenskeMineGroup" Private Joint-stock Company "DTEK Pavlogradugol", in 2018. (popup.stage: ). Institute of Geotechnical Mechanics named by N. Poljakov of National Academy of Sciences of Ukraine. № 0219U101138
1 documents found

Updated: 2026-03-22