1 documents found
Information × Registration Number 0219U101166, 0118U007644 , R & D reports Title To develop recommendations for the provision of gas safety of work at the release of the outlet air vent from the southern trench runway to the 534 north lava, to the fans of local ventilation of the tunnel faces 536 of the northern airway (pristine), 636 northern railroad runway, 636 northern airway, 538 northern combined drift mine "name of Stashkova" PSS "DniprovskoeMineGroup" Public Joint-stock Company of DTEK "Pavlogradugol", in 2018 popup.stage_title Head Minieiev Serhii P., Доктор технічних наук Registration Date 14-05-2019 Organization Institute of Geotechnical Mechanics named by N. Poljakov of National Academy of Sciences of Ukraine popup.description2 The purpose of the work is to develop recommendations for ensuring the dust-gas safety of works on the excavation section 534 of the northern lava of the C6 reservoir, as well as during the dead-end workings of 536 of the north side drift, 636 of the northern gathering drift, 636 of the north drift when installing their local ventilation fans in workings with outgoing air flow. Research methods - generalization and analysis of results, methods of mathematical statistics, calculations using standard methods. As a result of the work, the technical documentation on the dead-end workings and 534 northern lava of the mine "name of Stashkova" PSS "DniprovskoeMineGroup" DTEK "Pavlogradugol". “Recommendations to ensure dust-and-gas safety of works in the excavation section 534 of the northern lava of the C6 formation, as well as during dead-end workings of 536 of the northern side drift (secondary), 636 of the northern gathering drift, 536 of the northern gathering drift when installing their local fans airing in the workings with the outgoing ventilation stream of air mine "name of Stashkova" PSS "DniprovskoeMineGroup" Public Joint-stock Company of DTEK "Pavlogradugol". The release of the outgoing air stream from the dead-end production of the southern main haulage drift of the C6 formation to the stream of fresh air supplied to the ventilation of the excavation section 534 of the northern lava and the installation of local ventilation fans of the blind workings of 536 of the northern sidewall drift (secondary), 636 northern drift, 636 northern edge the drift and 538 of the northern modular drift in the workings with the outgoing air ventilation stream, subject to the implementation of the developed recommendations for the provision of gas pretensioners. The results of the implementation of the development - the application of the developed recommendations helped to ensure gas safety in mining, which is of great socio-economic and environmental importance. Product Description popup.authors popup.nrat_date 2020-04-02 Close
R & D report
Head: Minieiev Serhii P.. To develop recommendations for the provision of gas safety of work at the release of the outlet air vent from the southern trench runway to the 534 north lava, to the fans of local ventilation of the tunnel faces 536 of the northern airway (pristine), 636 northern railroad runway, 636 northern airway, 538 northern combined drift mine "name of Stashkova" PSS "DniprovskoeMineGroup" Public Joint-stock Company of DTEK "Pavlogradugol", in 2018. (popup.stage: ). Institute of Geotechnical Mechanics named by N. Poljakov of National Academy of Sciences of Ukraine. № 0219U101166
1 documents found

Updated: 2026-03-22