1 documents found
Information × Registration Number 0220U102859, 0120U100467 , R & D reports Title To approve the exact, type 1-M, the scheme of ventilation and the calculation of the air flow required for ventilation of the treatment plant and the excavation site, as well as the permissible gas load for the clearing of the indigenous lava horizon of 593 m of Private Joint-Stock Company «Management of the mine «POKROVSKE» 2019. popup.stage_title Head Minieiev Serhii P., Доктор технічних наук Registration Date 15-06-2020 Organization Institute of Geotechnical Mechanics named by N. Poljakov of National Academy of Sciences of Ukraine popup.description2 The object of study – ventilation of excavation sections of coal mines. The purpose of the work is to agree on a reverse, type 1-M, ventilation scheme and calculation of air flow required for ventilation of the treatment plant and excavation site, as well as the allowable gas factor load on the treatment face of the root lava of PJSC «Mine Management «Pokrovske». Research methods – generalization and analysis of results, methods mat. statistics, calculations by standard methods. As a result of the work, the mining-geological and mining characteristics of the excavation section of the root lava of PJSC «Mine Management «Pokrovske» were analyzed. "Recommendations for ensuring gas safety of the excavation section of the root lava of PJSC «Mine Management «Pokrovske» when using the reverse flow ventilation scheme, type 1-M" were developed. Approved the use of reverse, type 1-M, ventilation scheme of the excavation section of the root lava of the horizon 593 m, calculation of air flow required for its ventilation, and the maximum allowable loads on the treatment face by the gas factor in the first and second stages of lava development. The results of the implementation of developments – the application of the developed recommendations allowed to ensure gas safety during mining operations, which is of great socio-economic and environmental importance.  Product Description popup.authors popup.nrat_date 2020-07-03 Close
R & D report
Head: Minieiev Serhii P.. To approve the exact, type 1-M, the scheme of ventilation and the calculation of the air flow required for ventilation of the treatment plant and the excavation site, as well as the permissible gas load for the clearing of the indigenous lava horizon of 593 m of Private Joint-Stock Company «Management of the mine «POKROVSKE» 2019.. (popup.stage: ). Institute of Geotechnical Mechanics named by N. Poljakov of National Academy of Sciences of Ukraine. № 0220U102859
1 documents found

Updated: 2026-03-24