1 documents found
Information × Registration Number 0221U104382, 0120U103236 , R & D reports Title Carry out research and develop recommendations on the formation of expected value during the implementation of construction projects under the schemes "design-construction" and "design-construction-operation". popup.stage_title Head Bibyk Yuliia M., Registration Date 16-03-2021 Organization M.P. Shulgin State Road Research Institute State Enterprise popup.description2 Object of study - the process of formation of the expected value during the implementation of construction projects under “design – construction” and “design - construction – operation” schemes. Purpose of study – performing of study regarding formation of the expected value in the implementation of construction projects “design – construction” and “design - construction – operation” schemes, the results of which will be as a basis for recommendations development. Research method - analysis and systematization of information regarding creation and implementation of construction projects under “design – construction” and “design - construction – operation” schemes in the infrastructure sector. Implementation - improvement of the regulatory framework for the possibility of implementation of projects under “design - construction – operation” schemes on public roads. The significance of the work involves the fact that the results of the study will be used in the further implementation of construction projects under “design – construction” and “design - construction – operation” schemes. Performing studies at this stage will characterize the main principles, differences, advantages and disadvantages of the concept of integrated construction projects for its implementation in the road industry of Ukraine by developing of methodological support for the formation of the expected road works cost using these schemes of infrastructure projects implementation. Product Description popup.authors Bibyk Yuliia M Belska Olena L Hresko Ihor L popup.nrat_date 2021-03-17 Close
R & D report
Head: Bibyk Yuliia M.. Carry out research and develop recommendations on the formation of expected value during the implementation of construction projects under the schemes "design-construction" and "design-construction-operation".. (popup.stage: ). M.P. Shulgin State Road Research Institute State Enterprise. № 0221U104382
1 documents found

Updated: 2026-03-24