1 documents found
Information × Registration Number 0224U033356, (0124U002376) , R & D reports Title Develop and approve fire safety measures during the installation and operation of the mobile compressor unit UKVSH-15/7 in the air supply corridor of the central panel of block 11 of PJSC «Management of the mine «POKROVSKE». popup.stage_title Розробити та погодити заходи з пожежної безпеки при монтажу та експлуатації пересувної компресорної установки УКВШ-15/7 на повітряподавальному хіднику центральної панелі блоку 11 ПРАТ «ШУ «ПОКРОВСЬКЕ». Head Mineev Serhii P., Доктор технічних наук Registration Date 25-12-2024 Organization Institute of Geotechnical Mechanics named after MS Polyakova of the National Academy of Sciences of Ukraine popup.description1 Develop and approve fire safety measures during the installation and operation of the mobile compressor unit UKVSH-15/7 in the air supply corridor of the central panel of block 11 of PJSC «Management of the mine «POKROVSKE». popup.description2 The object of the study is to ensure fire safety during the operation of electrical equipment in mining operations of coal mines. The purpose of the work is to develop measures to ensure fire safety during the installation and operation of the mobile compressor unit UKVSh-15/7 on the air supply corridor of the central panel of block 11 of PJSC «Management of the mine "POKROVSKE". Research methods - generalization and analysis of results, methods of mathematics. statistics, calculations according to standard methods. As a result of the work, the mining technical characteristics of the air supply corridor of the central processing unit of block 11 of PJSC «Management of the mine "POKROVSKE" were analyzed. The requirements for the installation and operation of the mobile compressor UKVSH-15/7 in the air supply corridor of the central panel of block 11 and "Measures to ensure fire safety during the installation and operation of the mobile compressor station UKVSH-15/7 in the air supply corridor of the central panel of block 11 of PJSC "SHU" have been developed PJSC «Management of the mine "POKROVSKE". As a result of the application of the developed recommendations, the safety of mining operations will be increased, which is of great socio-economic and ecological importance.  Product Description popup.authors popup.nrat_date 2024-12-25 Close
R & D report
Head: Mineev Serhii P.. Develop and approve fire safety measures during the installation and operation of the mobile compressor unit UKVSH-15/7 in the air supply corridor of the central panel of block 11 of PJSC «Management of the mine «POKROVSKE».. (popup.stage: Розробити та погодити заходи з пожежної безпеки при монтажу та експлуатації пересувної компресорної установки УКВШ-15/7 на повітряподавальному хіднику центральної панелі блоку 11 ПРАТ «ШУ «ПОКРОВСЬКЕ».). Institute of Geotechnical Mechanics named after MS Polyakova of the National Academy of Sciences of Ukraine. № 0224U033356
1 documents found

Updated: 2026-03-22