1 documents found
Information × Registration Number 0302U003373, 0102U004394 , R & D reports Title Predesign develpomental work for construction of oil products terminal berthing structures popup.stage_title Виконання передпроектних опрацювань будівництва причальних споруд перевантажувального комплексу нафтопродуктів Head Nikulin S.G., Registration Date 22-07-2002 Organization State Project Development and Research institute of Marine Transport popup.description2 With the purpose of definition of technikal feasibility for construction of the terminal berthing structures a developmental work had been done where design structure and preliminary cost of sea berthing structures were determined. According to characteristics of water approaches, conditions of existing building-up, geological conditions in the area of supposed construction eight alternative of berthing structures had been considered, icluding two layout alternatives and two structural designs for two design vessel types. Each alternative provides building of auxiliary-purpose installations, including area of oil spillage eliminination, office and service buildings with control room, intra-site networks, as well as purchasing of fire boat. Desing solutions on composition, parameters and lay-out of the terminal onshore part were made in accordance with up-to-date technical requirements and complying environmental protection and explosion-and-fire safety standards in force in Ukraine. Coming from the results of comparison of technical and performanca characteristics with costs of construction alternatives it was recommended for futher design to accept a berhing structure for reception of HO-25 tanker with mooring part consisting of processing site taking fender stress, mooring dolphins and catwalks. The work executed is a basis for further design of the marine terminal.5635 Product Description popup.authors popup.nrat_date 2020-04-02 Close
R & D report
Head: Nikulin S.G.. Predesign develpomental work for construction of oil products terminal berthing structures. (popup.stage: Виконання передпроектних опрацювань будівництва причальних споруд перевантажувального комплексу нафтопродуктів). State Project Development and Research institute of Marine Transport. № 0302U003373
1 documents found

Updated: 2026-03-24