Information × Registration Number 0302U003467, 0196U017099 , R & D reports Title Designing, manufacturing and putting into operation the dust-catcher unit behind the boiler "Rafako" of energo-block № 1 at Mironovskya Hydro Power Station. popup.stage_title Розробка, проектування, виготовлення та пуск установки пиловловлення за котлом "Рафако" енергоблоку №1 Мироновской ГРЭС. Head Eroshenko V.G., Registration Date 10-12-2002 Organization Ukrainian State Scientific and Engineering Center " Energostal" popup.description2 It was implemented the project of the dust-catching system with electric filter which provides gas dedusting output from the boiler "Rafako" up to the level not more than 0.1g/m3. The work was closed in the complete volume according to the Customer' letter "Donbassenergo" № 09-19/396 dated 19.11.2002 Product Description popup.authors popup.nrat_date 2020-04-02 Close
R & D report
Head: Eroshenko V.G.. Designing, manufacturing and putting into operation the dust-catcher unit behind the boiler "Rafako" of energo-block № 1 at Mironovskya Hydro Power Station.. (popup.stage: Розробка, проектування, виготовлення та пуск установки пиловловлення за котлом "Рафако" енергоблоку №1 Мироновской ГРЭС.). Ukrainian State Scientific and Engineering Center " Energostal". № 0302U003467
1 documents found

Updated: 2026-03-25