1 documents found
Information × Registration Number 0302U003491, 0101U005481 , R & D reports Title Issue of design specifications for ZTMP design division for the modification of the ore-smelting furnace housing popup.stage_title Видати технічне завдання ПКВ ЗТМК на виконання проекту по реконструкції кожуха РТП Head Tetyana Guryanjva, Registration Date 23-12-2002 Organization State saintific research and progect institute of titanium popup.description2 Design approaches to compensate temperature expansion of furnace lining have been studied. Requirements have been placed on the modification of ore-smelting furnace housing. Mass and heat balances of OSF-2 have been taken off. In taking off the balances, the feedstock contained: 19813 kg Malyshevo deposit concentrate; 336.71 kg anthracite, 1908 kg fine coke. Total smelting and alive smelting took 7.08 hours and 6.44 hours, respectively. Power consumption: 32277 kWh; consumption of electrodes: 332 kg. Product Description popup.authors popup.nrat_date 2020-04-02 Close
R & D report
Head: Tetyana Guryanjva. Issue of design specifications for ZTMP design division for the modification of the ore-smelting furnace housing. (popup.stage: Видати технічне завдання ПКВ ЗТМК на виконання проекту по реконструкції кожуха РТП). State saintific research and progect institute of titanium. № 0302U003491
1 documents found

Updated: 2026-03-26