1 documents found
Information × Registration Number 0309U003585, 0109U005711 , R & D reports Title Development, creation and delivery of sample preparation systems (SPS) for the automated chemical control of the second contour heat-carrier of the second power unit boiler of the Rivne nuclear power plant (NPP), which are established in Є327 popup.stage_title Створення та поставка комплекту теплообмінників (далі - теплообмінники) для забезпечення хімічного контролю теплоносія 2-го контуру 2-го блоку Ровенської АЕС Head V. Burov, Registration Date 26-06-2009 Organization SE "Ukrenergyefficiency" popup.description2 SPP is one of basic component parts of the automated checking of the introductory-chemical mode of teplonositelya system, providing control of chemical composition of teplonositelya, the results of which drawn on for warning of failures by minimization of corrosion of construction materials of equipment and pipelines Product Description popup.authors popup.nrat_date 2020-04-02 Close
R & D report
Head: V. Burov. Development, creation and delivery of sample preparation systems (SPS) for the automated chemical control of the second contour heat-carrier of the second power unit boiler of the Rivne nuclear power plant (NPP), which are established in Є327. (popup.stage: Створення та поставка комплекту теплообмінників (далі - теплообмінники) для забезпечення хімічного контролю теплоносія 2-го контуру 2-го блоку Ровенської АЕС). SE "Ukrenergyefficiency". № 0309U003585
1 documents found

Updated: 2026-03-24