Registration Number
0208U004968,
0108U010496
, R & D reports
Title
The determination and ground of expedience of European standard railway building of the of 1435 мм in the direction of Frontier - Kovel'-Kiev
popup.stage_title
Head
Toropov B.,
Registration Date
25-12-2008
Organization
The Research and Project Institute of Transport Engineering "KYIEVGIPROTRANS".
popup.description2
The generalized conclusions concerning to the organizational and technical aspects of creation of the systems of HSR (high-speed railway) was made. The conceptual model of HSR for direction Frontier - Kovel'-Kiev, its basic operating-technical parameters and building norms, variants of a route passing was specified. The fundamental technical and technological decisions concerning the complex of basic buildings and equipment of HSR was given. The fundamental positions of the systems of its operating safety, management, current service and repair of permanent equipment and rolling-stock were determined. The reference cost of building of HSR, general investment estimation of project, expedience of building of HSR was determined. The Reasoning concerning the organizational aspects of building of this HSR is given563556355635
Product Description
popup.authors
popup.nrat_date
2020-04-02