1 documents found
Information × Registration Number 0213U001947, 0112U008057 , R & D reports Title Determination of the most optimal technological scheme for the delivery of overburden rocks in storage in conditions of career InMCC popup.stage_title Head Kovalev Konstantin Valerievich, Registration Date 15-03-2013 Organization State enterprise "State institute on designing enterprises of the mining industry "KRIVBASSPROEKT" popup.description2 A research object is a transport flow sheet of an open-pit of PSC "InMCC". The aim of the work is determination of the most optimal transport chart on delivery of stripping breeds in dumps, and also to optimize load-transport streams, both in a career and directly in the directions of the open-pit - dumps. A research method is an analysis of flow sheets, method of variants, design of transport charts, feasibility analysis. In the question of perfection of technology of openwork of deposits of minerals the important place is occupied by optimization of chart of portage of overburden. On efficiency of technology of extraction and processing of the mineral, load-transport connection between working horizons of the open-pit and surface, the optimal work of which is provided by the flow sheet of portage (applied in good time) of overburden in dumps. According to the conditions of the open-pit of InMCC, project decisions and existent technologies, in this work the next variants of development of flow sheets of delivery of overburden are investigated with determination of an area of application of different types of transport and its combinations : with the use of motor-car, railway and motor-car-railway types of transport (base variant); with the use of motor-car, railway, motor-car-railway and motor-car - railway - conveyor types of transport with building of high-angle conveyer (HAC); with the use of motor-car, railway, motor-car-railway and motor-car - railway - conveyor types of transport with the use of existent ore conveyer highway; with the use of motor-car, railway, motor-car-railway and motor-car - railway - conveyor types of transport with building of the skip lift (SL); with the use of motor-car, railway, motor-car-railway and motor-car-conveyer types of transport with the use of high-angle conveyer (HAC) and supporting sectional dump-formation. The feasibility and power estimation of the described variants is executed in this work, the recommendations, concerning development of chart of delivery of overburden, are brought in this work either. The results of SRW can be used in the further project work of development of the open-pit of PSC "InMCC". Product Description popup.authors Бабець Альона Іванівна Бабець Ольга Миколаївна Батаєва Олена Дмитрівна Бурлака Наталія Яківна Вегера Зоя Миколаївна Григор'єв Юліан Ігорович Гук Андрій Юрійович Дейнега Юрій Миколайович Драгун Борис Титович Дрок Олександр Володимирович Зубченко Наталія Володимирівна Кітов Антон Андрійович Ланцетова Тетяна В'ячеславівна Мироненко Андрій Іванович Плотніков Володимир Федорович Сторчак Віктор Олександрович Терещенко Владислав Вікторович Фурса Євген Юрійович Шаповалова Галина Михайлівна Швець Дмитро Валерійович Шевчук Олександр Володимирович Шпак Олександр Володимирович popup.nrat_date 2020-04-02 Close
R & D report
Head: Kovalev Konstantin Valerievich. Determination of the most optimal technological scheme for the delivery of overburden rocks in storage in conditions of career InMCC. (popup.stage: ). State enterprise "State institute on designing enterprises of the mining industry "KRIVBASSPROEKT". № 0213U001947
1 documents found
search.subscribing
search.subscribe_text
Updated: 2026-03-26
