1 documents found
Information × Registration Number 0215U007671, 0114U006240 , R & D reports Title To develop the industry standard regarding the procedure of determining the cost of survey and design works for new construction, reconstruction and repair of public road and bridges. (see n. pl. 74) popup.stage_title Head Julia Bibyk, Registration Date 18-12-2015 Organization The State enterprise ''State Highway Scientific Research Institute'' popup.description2 The object of study is cost formation procedure of design and survey works for new construction, reconstruction and repair of public roads and transport facilities on them (further - D&S). The purpose of the study is development of sectoral regulations to determine the cost of D&S. The research methods are analysis of existing domestic and foreign D&S cost calculation procedures and identification of their disadvantages; collection of comments about the existing mechanism for cost determination from D&S customers and design organizations; analysis of foreign experience about D&S cost determination the; analysis of initial data about estimated cost of design and survey and construction work; bringing the cost of funding allocated for design and survey and construction works to the calculated level of 2014; comparison of this estimated cost; synthesis of sectoral regulations with averaged percentage indicators. Product Description popup.authors Бібик Ю.М. Безуглий А.О. Бельська О.Л. Гресько І.Л. Жигайло О.В. Концева В.В. Стасюк Б.О. popup.nrat_date 2020-04-02 Close
R & D report
Head: Julia Bibyk. To develop the industry standard regarding the procedure of determining the cost of survey and design works for new construction, reconstruction and repair of public road and bridges. (see n. pl. 74). (popup.stage: ). The State enterprise ''State Highway Scientific Research Institute''. № 0215U007671
1 documents found

Updated: 2026-03-22