1 documents found
R & D report
Head: Minieiev Serhii Р.. Agree on a retroactive, type 1-M, ventilation scheme and calculation of air consumption required for ventilation of the treatment plant and excavation site, as well as the allowable gas factor load on the treatment face 13 of the southern lava block 10 of PJSC PJSC «Management of the mine «POKROVSKE» in 2022. Institute of Geotechnical Mechanics named after MS Polyakova of the National Academy of Sciences of Ukraine. № 0222U004592
1 documents found

Updated: 2024-04-25