Registration Number
0308U001325,
0107U002217
, R & D reports
Title
Development of Branch norms of time is on editing of metallic constructions. Drafting the issue 3 "Bridges and pipes" (part 2) of Assemblage book BS 5 "Assemblage of the metallic constructions" and ralify it in accordance with established procedure.
popup.stage_title
Розроблення Галузевих норм часу на монтаж металевих конструкцій. Складання випуску 3 "Мости та труби" (частина 2) Збірника ГН 5 "Монтаж металевих конструкцій" та його затвердження в установленому порядку.
Head
Shevchuk K. I.,
Registration Date
07-02-2008
Organization
Centre "Ekobud"
popup.description2
Object of research - expenditures the time of the workers, which are carry out in assembling of the metallic constructions. Purpose of work - preparation and ralify in accordance with established procedure the Issue 3 "Bridges and pipes" (part 2) Assemblage book of Branch norms of time BS 5 "Assemblage the metallic constructions". Methods - the technical rate setting (mixed photocalculation and methods of analitik calculation).5635
Product Description
popup.authors
popup.nrat_date
2020-04-02