1 documents found
Information × Registration Number 2117U006459, Article popup.category Стаття, Опубліковано Title The Reasons of Differential Wall Sticking in Drilling Oil and Gas Wells (AI translated) popup.author Nalivaiko О.Nalivaiko L.Reznichenko A.Chyhyriov V.Nalivaiko O.Nalivaiko L.Reznichenko A.Chyhyriov V. popup.publication 14-04-2017 popup.source_user Національний університет «Полтавська політехніка імені Юрія Кондратюка» popup.source https://journals.nupp.edu.ua/znp/article/view/206 popup.publisher National University «Yuri Kondratyuk Poltava Polytechnic» Description Of the article raised the question of occurrence the causes of differential wall sticking.An attempt to analyze the mechanism of differential wall sticking in drilling oil and gas wellswas made. Operations in liquidation of wall sticking and casing pipe that occur in drilling arethe most difficult and time-consuming. One of the ways to improve the requirements ofcasingstring cementing is the use of different chemical additives in cement that change the structureof well cement. One of them is hydrophobic additive «Silpan-Р», which effectiveness isdescribed in the article. Own view on the issue of process occurrence of differential wallsticking that is different from the existing ones was offered.Keywords: drill string, differential sticking, osmosis, hydrophobic additive «Silpan-Р»,well, pressure. popup.nrat_date 2026-04-19 Close
Article
Стаття
Опубліковано
Nalivaiko О.. The Reasons of Differential Wall Sticking in Drilling Oil and Gas Wells (AI translated) : published. 2017-04-14; Національний університет «Полтавська політехніка імені Юрія Кондратюка», 2117U006459
1 documents found

Updated: 2026-04-22