1 documents found
search.res_rk
Head: Minieiev Serhii P.. To agree back exact type 1-M, scheme of ventilation and calculation of the air flow required for ventilation of the treatment plant and excavation site, as well as the permissible gas load on the clearing of the 18 southern lava of the formation l1 of the slope № 1 of LLC «Mine 1-3 Novogrodivskа», To approve the acts establishing the technically achievable residual air dust levels (TDR) for 2020 and to conclude on the feasibility of applying pre-wet coal in the array for the entire period of working out of this excavation site..
Institute of Geotechnical Mechanics named by N. Poljakov of National Academy of Sciences of Ukraine. № 0119U103830
1 documents found
Updated: 2026-03-19
