1 documents found
Information × Registration Number 0206U000515, 0105U003040 , R & D reports Title Inspection and test of the bridge across Ushitsa river on the road M- 20 Zhytomyr - Chernovtsy - Terebleche km 216+920. popup.stage_title Head Balabukh Yaroslav A., Registration Date 27-01-2006 Organization State Highway Scientific Research Institute popup.description2 Object of research is the condition of bridge span structures across river Ushitsa on the road M-20 Zhitomyr-Chernivtsi-Terebleche km 216+920. Aim of research is research and analysis of span bridge structures, measuring and instrumental survey, calculation of tensions and deformations of span structures from reinforced concrete. Method of research is analytical. As the results of research and analysis the registers of reinforced concrete structures defects and drawings to technical conclusions of bridge structures condition.5635 Product Description popup.authors popup.nrat_date 2020-04-02 Close
R & D report
Head: Balabukh Yaroslav A.. Inspection and test of the bridge across Ushitsa river on the road M- 20 Zhytomyr - Chernovtsy - Terebleche km 216+920.. (popup.stage: ). State Highway Scientific Research Institute. № 0206U000515
1 documents found

Updated: 2026-03-21