1 documents found
Head: Arbuzov Maxim. The development of the technical requirements on the crossovers laying on the turnout concrete sleepers by intertrack space with size 4.8 m by using turnouts of the 1740.00.000; (01) project with the tangent of the frog angle 1/11 and Р65 type of rail. (popup.stage: ). Dnipropetrovsk National University of Railway Transport named after Academician V.Lazaryan. № 0217U003812
1 documents found
Updated: 2026-03-22
