Реєстраційний номер
2120U009861, Матеріали видань та локальних репозитаріїв
Категорія
Стаття
Назва роботи
Application of models and methods of integrated risk management of stakeholders of scientific projects in conditions of uncertainty and behavioral economics
Автор
Bedrii Dmytro
Danchenko Olena
Semko Inga
Бедрій Дмитро Іванович
Данченко Олена Борисівна
Семко Інга Борисівна
Bedrii Dmytro
Danchenko Olena
Semko Inga
Bedrii Dmytro Ivanovych
Danchenko Olena Borysivna
Semko Inha Borysivna
Дата публікації
01-01-2020
Постачальник інформації
Черкаський державний технологічний університет
Першоджерело
https://er.chdtu.edu.ua/handle/ChSTU/2807
Видання
Technology audit and production reserves
Опис
The object of research is the processes of integrated risk management of stakeholders of scientific projects,
including the project team, the main executors of the project (scientists) and other stakeholders, in conditions
of uncertainty and behavioral economics. Today, scientists work in difficult conditions of uncertainty about the
prospects for the development of science, technology and engineering. Therefore, it can lead to personnel risks,
conflicts and behavioral economics and have a negative impact on the planning and implementation of scientific
projects. The main hypothesis of the study is the assumption that the success of scientific projects depends on the
effective management of their stakeholders in order to achieve their goals. It is necessary to systematically approach the analysis of stakeholders of scientific projects, the use of integrated risk management of stakeholders
of scientific projects in conditions of uncertainty and behavioral economics. Based on the analysis of risk management methods in different areas of activity and taking into account the conceptual model of integrated risk
management of scientific projects, a method of integrated risk management of stakeholders of scientific projects
in uncertainty and behavioral economics was proposed. For the practical application of the developed models and
methods of integrated risk management of stakeholders of scientific projects in conditions of uncertainty and
behavioral economics, the scientific project was considered. Their use, even at the stage of initiating scientific
projects, allowed the project manager and his/her team to calculate the indicator of «toxicity» for each alternative
stakeholders and compare them with each other. It is based on data obtained in the process of assessing personnel
risks, conflicts and factors of behavioral economics, which was conducted using the method of expert assessments.
The indicator of «toxicity» is limited and should be close to zero. An example of choosing a stakeholder for the
supply of stationery is considered. This result allowed to increase the efficiency of inclusion of stakeholders in the
participants of the scientific project.
Додано/оновлено в НРАТ
2026-04-27